井盖模具生产前的准备工作
发布人:管理员   发布时间:2020-8-18

目前井盖模具制造水平已达到国际水准,只要一直保持下去,不断的创新发展,前景还是很好的。不仅在市场占地规模,建筑面积等硬件指标上得到体现,更重要的是市场内品牌、产品、制造工厂、贸易商的积聚度。
At present, the manufacturing level of well cover mould has reached the international level. As long as it is maintained and innovated continuously, the prospect is still very good. It is not only reflected in the scale of market occupation, building area and other hardware indicators, but also the accumulation of brands, products, manufacturing plants and traders in the market.

从实际加工的井盖模具来看,需要做到使用便利、组合运用、周转时间长。在具体生产产品的时候,其工程是非常复杂的,我们需要做的工作有很多。
From the actual processing of well cover mold, it needs to be convenient to use, combined use, long turnover time. In the specific production of products, the engineering is very complex, we need to do a lot of work,

我们在生产制作中除了井盖模具需要准备之外,还需要准备混凝土搅拌机,这种设备主要是制作混凝土时使用的,还需要准备的就是震动工具。
In addition to the well cover mold, we also need to prepare the concrete mixer. This kind of equipment is mainly used when making concrete. What we need to prepare is vibration tools.

            

在野外生产制作的时候,振动平台的运输是非常的麻烦,所以我们选择了振动棒,这种工具虽然小巧,但是震动效果是不错的,通过充分震动的混凝土产品,
In the field production, the transportation of the vibration platform is very troublesome, so we chose the vibrator. Although the tool is small, the vibration effect is good. Through the concrete products with full vibration,

我们还需要准备的就是电动扳手,因为井盖模具的连接方式是螺丝,为了更快速的进行模具的安装和拆卸,我们需要借助电动扳手,其次就是一些吊车设备,主要是因为很多物品的搬运是十分麻烦的,我们需要使用到吊车。
What we need to prepare is the electric wrench, because the connection mode of the manhole cover mold is screw. In order to install and dismantle the mold more quickly, we need to use the electric wrench, followed by some crane equipment, mainly because the handling of many items is very troublesome, we need to use the crane.